The Birth of a Phaeton - Part 2

The Birth of a Phaeton - Part 2

8/14 - 9/1

(Want more detail?  Click on image to enlarge)

We picked up at Station 2 bright and early the next morning.  Station 2 is for flooring, the engine cover, and the stairwell.  

The subfloor is laid in place and then adjusted...
It's aligned with the side rails and flattened as needed
And attached with screws to the frame
The tile floor is built at the Belmont facility and then all of the cutouts for
wiring, heating, plumbing are cut using a CNC water jet system 
The hoist uses suction cups to hold the floor which is bonded to the subfloor with mastic and temporary screws. 
The engine cover is added
And the front framing is added