The Birth of a Phaeton - Part 2
8/14 - 9/1
(Want more detail? Click on image to enlarge)
We picked up at Station 2 bright and early the next morning. Station 2 is for flooring, the engine cover, and the stairwell.
The subfloor is laid in place and then adjusted...
|
It's aligned with the side rails and flattened as needed |
|
And attached with screws to the frame |
|
The tile floor is built at the Belmont facility and then all of the cutouts for wiring, heating, plumbing are cut using a CNC water jet system |
|
The hoist uses suction cups to hold the floor which is bonded to the subfloor with mastic and temporary screws. |
|
The engine cover is added |
|
And the front framing is added |