Sunday, September 1, 2013

The Birth of a Phaeton - Part 3

The Birth of a Phaeton - Part 3

8/14 - 9/1

(Want more detail?  Click on image to enlarge)

Once the floor was on the coach moved to the next station to start turning it into something other than a nicely tiled, flat floored, rear engined truck.

If you want to watch JIT (just in time) manufacturing practices, come to the Tiffin plant.  Just as the coach moved to the next station, up rolls a cart with the next parts to be installed ready to be unloaded.

Washer/dryer cabinet work
Main bathroom cabinet work
Washer/dryer cabinet and closet frame
Toilet installed!
Washer/dryer installed
Shower installed 
Main DC Fuse panel before
And after
Dashboard prep 
And install



No comments:

Post a Comment